Shunhai 2nd Independently Designed and Built 98m 6200m3 Fuel Carrying & Supply Vessel was Successfully Launched

Created on 2025.04.12
Ship under construction with scaffolding and workers on deck.
Ship named Zaki Dream in dry dock, surrounded by cranes and high-rise buildings.
Ship under construction at a shipyard, surrounded by cranes and industrial buildings.
Shipyard crew stands before a large vessel named Zaki Dream, with construction equipment nearby.
WeChat